Difference between revisions of "Portal:Featured Article Of The Week"

From Asylum Projects
Jump to: navigation, search
(31 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
{{FAformat
 
{{FAformat
|Title= Weston State Hospital
+
|Title= Ypsilanti State Hospital
|Image= Westsh.jpg
+
|Image= ypsilantiMI002.jpg
 
|Width= 150px
 
|Width= 150px
|Body= This was West Virginia's first public institution. Its construction was begun by the State of Virginia before the separation of West Virginia from the mother state, the first appropriation having been made by the Legislature of Virginia, March 22, 1858. The institution was opened October 22, 1859, when nine patients were brought from Ohio, where they had been in temporary care awaiting the completion of the hospital. Dr. R. Hills, formerly of the Central Ohio Insane Asylum, was made superintendent and Dr. N. B. Barnes, assistant.
+
|Body= During the 1920s the necessity for an additional state hospital became apparent. The combined capacity of the existing state hospitals was 1,900 beds short of what was considered adequate. In 1929 Governor Green proposed that a fifth state hospital be developed. The first appropriation of $1.5 million for the fiscal year ending 1930 was passed. Ypsilanti was chosen because of it's population density and proximity to the University Center in Ann Arbor as well as it's availability of land. Purchase of the 1,209 acres was begun in 1929.
  
In the first years of its history the institution was encompassed with many difficulties. Not only were there financial troubles, but Confederate soldiers in a raid appropriated the blankets belonging to the patients, and in a second raid a ward was destroyed. The people of Weston very generously came to the rescue and contributed their own blankets to fill the temporary needs, public acknowledgment of which was made by the superintendent in his report. In 1868 the population of the hospital was 40; since that date there has been a continual increase in the number of inmates, and a corresponding increase in the appropriation for running expenses, until at the present time the population of the institution is 1023.  [[Weston State Hospital|Click here for more...]]
+
On June 16, 1930 the breaking of ground was underway. The following year the Legislature formalized the name and function for the institution. The architectural firm of Albert Kahn designed the buildings and contracts were let out for construction work to 35 separate companies. Construction work was pushed at what was described as a "miracle pace".
 +
 
 +
The first patients were admitted one day short of the 1 year mark since the groundbreaking. At the time of the formal dedication, July 28, 1931, the physical plant consisted of the receiving hospital and administration building ("A" building), C-1 and C-2 blocks with combined facilities for approximately 900 patients; the unit containing 6 apartments ("J" building); dormitory and apartments for employees (K-1); powerhouse, warehouse & the superintendents quarters. All main buildings to which patients would have need of access were connected by underground tunnels.  [[Ypsilanti State Hospital|Click here for more...]]
 
}}
 
}}

Revision as of 05:11, 27 November 2022

Featured Article Of The Week

Ypsilanti State Hospital


ypsilantiMI002.jpg

During the 1920s the necessity for an additional state hospital became apparent. The combined capacity of the existing state hospitals was 1,900 beds short of what was considered adequate. In 1929 Governor Green proposed that a fifth state hospital be developed. The first appropriation of $1.5 million for the fiscal year ending 1930 was passed. Ypsilanti was chosen because of it's population density and proximity to the University Center in Ann Arbor as well as it's availability of land. Purchase of the 1,209 acres was begun in 1929.

On June 16, 1930 the breaking of ground was underway. The following year the Legislature formalized the name and function for the institution. The architectural firm of Albert Kahn designed the buildings and contracts were let out for construction work to 35 separate companies. Construction work was pushed at what was described as a "miracle pace".

The first patients were admitted one day short of the 1 year mark since the groundbreaking. At the time of the formal dedication, July 28, 1931, the physical plant consisted of the receiving hospital and administration building ("A" building), C-1 and C-2 blocks with combined facilities for approximately 900 patients; the unit containing 6 apartments ("J" building); dormitory and apartments for employees (K-1); powerhouse, warehouse & the superintendents quarters. All main buildings to which patients would have need of access were connected by underground tunnels. Click here for more...