Difference between revisions of "Portal:Featured Article Of The Week"

From Asylum Projects
Jump to: navigation, search
(34 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
{{FAformat
 
{{FAformat
|Title= Osawatomie State Hospital
+
|Title= Ypsilanti State Hospital
|Image= 00052877a.jpg
+
|Image= ypsilantiMI002.jpg
 
|Width= 150px
 
|Width= 150px
|Body= In 1868, the Kansas legislature appropriated funds for a permanent treatment structure to replace all of the existing structures on the asylum grounds. State architect J.G. Haskell presented plans drawn according to the recommended design by Dr. Thomas Story Kirkbride of Pennsylvania. The center of the building had twin turrets for administrative offices with extended wings offset right and left for patients. The wings were placed so that fresh air could reach them from both sides. As the 1868 Kirkbride plan for new buildings progressed over the next 18 years, the need for additional patient space presented a continual problem for the asylum.
+
|Body= During the 1920s the necessity for an additional state hospital became apparent. The combined capacity of the existing state hospitals was 1,900 beds short of what was considered adequate. In 1929 Governor Green proposed that a fifth state hospital be developed. The first appropriation of $1.5 million for the fiscal year ending 1930 was passed. Ypsilanti was chosen because of it's population density and proximity to the University Center in Ann Arbor as well as it's availability of land. Purchase of the 1,209 acres was begun in 1929.
  
The years 1892 and 1895 saw the addition of two detached buildings, the Knapp and Adair buildings. The Knapp building, named for former superintendent Abram H. Knapp, was completed in 1892 and housed 300 "chronic" or "incurable" male patients (the Knapp building was closed in the 1960’s). Abram H. Knapp served as superintendent from 1873-1877 and again from 1878-1892. His tenure as superintendent was considered stormy and tempestuous. Knapp was a controversial figure from the start, two months after he assumed authority as superintendent, a number of asylum employees protested against the "new and more rigid form of administration" by marching off in what was considered a "mutiny.[[Osawatomie State Hospital|Click here for more...]]
+
On June 16, 1930 the breaking of ground was underway. The following year the Legislature formalized the name and function for the institution. The architectural firm of Albert Kahn designed the buildings and contracts were let out for construction work to 35 separate companies. Construction work was pushed at what was described as a "miracle pace".
 +
 
 +
The first patients were admitted one day short of the 1 year mark since the groundbreaking. At the time of the formal dedication, July 28, 1931, the physical plant consisted of the receiving hospital and administration building ("A" building), C-1 and C-2 blocks with combined facilities for approximately 900 patients; the unit containing 6 apartments ("J" building); dormitory and apartments for employees (K-1); powerhouse, warehouse & the superintendents quarters. All main buildings to which patients would have need of access were connected by underground tunnels. [[Ypsilanti State Hospital|Click here for more...]]
 
}}
 
}}

Revision as of 05:11, 27 November 2022

Featured Article Of The Week

Ypsilanti State Hospital


ypsilantiMI002.jpg

During the 1920s the necessity for an additional state hospital became apparent. The combined capacity of the existing state hospitals was 1,900 beds short of what was considered adequate. In 1929 Governor Green proposed that a fifth state hospital be developed. The first appropriation of $1.5 million for the fiscal year ending 1930 was passed. Ypsilanti was chosen because of it's population density and proximity to the University Center in Ann Arbor as well as it's availability of land. Purchase of the 1,209 acres was begun in 1929.

On June 16, 1930 the breaking of ground was underway. The following year the Legislature formalized the name and function for the institution. The architectural firm of Albert Kahn designed the buildings and contracts were let out for construction work to 35 separate companies. Construction work was pushed at what was described as a "miracle pace".

The first patients were admitted one day short of the 1 year mark since the groundbreaking. At the time of the formal dedication, July 28, 1931, the physical plant consisted of the receiving hospital and administration building ("A" building), C-1 and C-2 blocks with combined facilities for approximately 900 patients; the unit containing 6 apartments ("J" building); dormitory and apartments for employees (K-1); powerhouse, warehouse & the superintendents quarters. All main buildings to which patients would have need of access were connected by underground tunnels. Click here for more...