Difference between revisions of "Portal:Featured Article Of The Week"

From Asylum Projects
Jump to: navigation, search
(43 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
{{FAformat
 
{{FAformat
|Title= Patton State Hospital
+
|Title= Ypsilanti State Hospital
|Image= Patton.jpg
+
|Image= ypsilantiMI002.jpg
 
|Width= 150px
 
|Width= 150px
|Body= Patton State Hospital is a major forensic mental hospital operated by the California Department of Mental Health. It is located in San Bernardino, California, a community of approximately 181,000 people. The hospital was first opened in August 1, 1893. In 1927 it was renamed Patton State Hospital after a member of the first Board of Managers, Harry Patton of Santa Barbara.
+
|Body= During the 1920s the necessity for an additional state hospital became apparent. The combined capacity of the existing state hospitals was 1,900 beds short of what was considered adequate. In 1929 Governor Green proposed that a fifth state hospital be developed. The first appropriation of $1.5 million for the fiscal year ending 1930 was passed. Ypsilanti was chosen because of it's population density and proximity to the University Center in Ann Arbor as well as it's availability of land. Purchase of the 1,209 acres was begun in 1929.
  
Patton State Hospital is currently a forensic hospital with a licensed bed capacity of 1287 for individuals who have been committed by the judicial system for treatment. Currently the hospital is fully accredited by the Joint Commission on Accreditation of HealthCare Organizations (JCAHO). The Joint Commission's Board of Commissioner's approved a proposal to conduct all regular accreditation surveys on an unannounced basis beginning January 2006. Joint Commission standards deal with organizational quality of care issues and the safety of the environment in which care is provided.
+
On June 16, 1930 the breaking of ground was underway. The following year the Legislature formalized the name and function for the institution. The architectural firm of Albert Kahn designed the buildings and contracts were let out for construction work to 35 separate companies. Construction work was pushed at what was described as a "miracle pace".
  
The hospital currently provides psychiatric care and treatment to judicially committed, mentally disordered adult individuals. The Individuals served are assigned to a living unit, which is part of one of the seven Treatment Programs. The hospital is currently going through changes regarding how treatment is provided to the Individuals we serve. Currently treatment is delivered through a centralized approach, where the Individuals served and the staff, from throughout the Hospital, come together to participate in services within Psychosocial Rehabilitation (PSR) Malls. Mall interventions are provided, as much as possible, in the context of real-life functioning and in the rhyme of life of the Individual. Thus, a PSR mall extends beyond the context of a building or place and its services are based on the needs of the Individual, not the needs of the program, the staff members or the institution.  [[Patton State Hospital|Click here for more...]]
+
The first patients were admitted one day short of the 1 year mark since the groundbreaking. At the time of the formal dedication, July 28, 1931, the physical plant consisted of the receiving hospital and administration building ("A" building), C-1 and C-2 blocks with combined facilities for approximately 900 patients; the unit containing 6 apartments ("J" building); dormitory and apartments for employees (K-1); powerhouse, warehouse & the superintendents quarters. All main buildings to which patients would have need of access were connected by underground tunnels.  [[Ypsilanti State Hospital|Click here for more...]]
 
}}
 
}}

Revision as of 05:11, 27 November 2022

Featured Article Of The Week

Ypsilanti State Hospital


ypsilantiMI002.jpg

During the 1920s the necessity for an additional state hospital became apparent. The combined capacity of the existing state hospitals was 1,900 beds short of what was considered adequate. In 1929 Governor Green proposed that a fifth state hospital be developed. The first appropriation of $1.5 million for the fiscal year ending 1930 was passed. Ypsilanti was chosen because of it's population density and proximity to the University Center in Ann Arbor as well as it's availability of land. Purchase of the 1,209 acres was begun in 1929.

On June 16, 1930 the breaking of ground was underway. The following year the Legislature formalized the name and function for the institution. The architectural firm of Albert Kahn designed the buildings and contracts were let out for construction work to 35 separate companies. Construction work was pushed at what was described as a "miracle pace".

The first patients were admitted one day short of the 1 year mark since the groundbreaking. At the time of the formal dedication, July 28, 1931, the physical plant consisted of the receiving hospital and administration building ("A" building), C-1 and C-2 blocks with combined facilities for approximately 900 patients; the unit containing 6 apartments ("J" building); dormitory and apartments for employees (K-1); powerhouse, warehouse & the superintendents quarters. All main buildings to which patients would have need of access were connected by underground tunnels. Click here for more...