Difference between revisions of "Portal:Featured Article Of The Week"

From Asylum Projects
Jump to: navigation, search
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
{{FAformat
 
{{FAformat
|Title= Farmington State Hospital
+
|Title= Ypsilanti State Hospital
|Image= Farmington.jpg
+
|Image= Toledo11.jpg
 
|Width= 150px
 
|Width= 150px
|Body= Received its first patients in 1903. The state budgeted $150,000 to build the hospital itself and in 1901, an additional $120,000 went for new buildings and equipment. Five cottages were built for patients and from 1901 to 1902 a dining room, kitchen, power house, barns, laundry, ice plant, the folk building (set aside for nurses, attendants and recreation), an administration building, the Hall building, the superintendents' residences and the Harrison Building, a receiving building and acute care hospital, were constructed. Dr. William Hall admitted the first three patients in 1903 and by 1904, the population stood at 332. By 1907, 795 patients were housed at the hospital. By 1922, the hospital was so crowded the superintendent's home was converted to housing for women patients. In 1925, the Hyde Building was built and the Folk Building was converted to house female patients. Another milestone was marked in 1925 when Dr. Emmett Hoctor took over as superintendent of Farmington State Hospital, then known as State hospital Number 4.  [[Farmington State Hospital|Click here for more...]]
+
|Body= During the 1920s the necessity for an additional state hospital became apparent. The combined capacity of the existing state hospitals was 1,900 beds short of what was considered adequate. In 1929 Governor Green proposed that a fifth state hospital be developed. The first appropriation of $1.5 million for the fiscal year ending 1930 was passed. Ypsilanti was chosen because of it's population density and proximity to the University Center in Ann Arbor as well as it's availability of land. Purchase of the 1,209 acres was begun in 1929.
 +
 
 +
On June 16, 1930 the breaking of ground was underway. The following year the Legislature formalized the name and function for the institution. The architectural firm of Albert Kahn designed the buildings and contracts were let out for construction work to 35 separate companies. Construction work was pushed at what was described as a "miracle pace".
 +
 
 +
The first patients were admitted one day short of the 1 year mark since the groundbreaking. At the time of the formal dedication, July 28, 1931, the physical plant consisted of the receiving hospital and administration building ("A" building), C-1 and C-2 blocks with combined facilities for approximately 900 patients; the unit containing 6 apartments ("J" building); dormitory and apartments for employees (K-1); powerhouse, warehouse & the superintendents quarters. All main buildings to which patients would have need of access were connected by underground tunnels.  [[Ypsilanti State Hospital|Click here for more...]]
 
}}
 
}}

Revision as of 10:05, 20 April 2025

Featured Article Of The Week

Ypsilanti State Hospital


Toledo11.jpg

During the 1920s the necessity for an additional state hospital became apparent. The combined capacity of the existing state hospitals was 1,900 beds short of what was considered adequate. In 1929 Governor Green proposed that a fifth state hospital be developed. The first appropriation of $1.5 million for the fiscal year ending 1930 was passed. Ypsilanti was chosen because of it's population density and proximity to the University Center in Ann Arbor as well as it's availability of land. Purchase of the 1,209 acres was begun in 1929.

On June 16, 1930 the breaking of ground was underway. The following year the Legislature formalized the name and function for the institution. The architectural firm of Albert Kahn designed the buildings and contracts were let out for construction work to 35 separate companies. Construction work was pushed at what was described as a "miracle pace".

The first patients were admitted one day short of the 1 year mark since the groundbreaking. At the time of the formal dedication, July 28, 1931, the physical plant consisted of the receiving hospital and administration building ("A" building), C-1 and C-2 blocks with combined facilities for approximately 900 patients; the unit containing 6 apartments ("J" building); dormitory and apartments for employees (K-1); powerhouse, warehouse & the superintendents quarters. All main buildings to which patients would have need of access were connected by underground tunnels. Click here for more...