Difference between revisions of "Portal:Featured Article Of The Week"

From Asylum Projects
Jump to: navigation, search
(28 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
{{FAformat
 
{{FAformat
|Title= Yankton State Hospital
+
|Title= Ypsilanti State Hospital
|Image= Yankton SD PC 4.jpg
+
|Image= Toledo11.jpg
 
|Width= 150px
 
|Width= 150px
|Body= The completion of the railway into Yankton in 1873 gave added impetus to immigration and by 1878 the effect of the gold rush was reflected in the number of Dakota patients at St. Peter Hospital, totaling 22. Governor William A. Howard was advised in June by Minnesota that no more patients could be accepted after July 1 because of crowded conditions at that hospital and all Dakota patients would have to be removed by October 1, 1878.
+
|Body= During the 1920s the necessity for an additional state hospital became apparent. The combined capacity of the existing state hospitals was 1,900 beds short of what was considered adequate. In 1929 Governor Green proposed that a fifth state hospital be developed. The first appropriation of $1.5 million for the fiscal year ending 1930 was passed. Ypsilanti was chosen because of it's population density and proximity to the University Center in Ann Arbor as well as it's availability of land. Purchase of the 1,209 acres was begun in 1929.
  
The Governor contacted Iowa hospitals without success, then traveled to Lincoln, Nebraska, and found that institution overcrowded but by completing some unfinished rooms, accommodations were arranged for five patients until the following February. Another contract with Minnesota resulted in an extension until February 1, 1879, for removal of the patients from St. Peter.
+
On June 16, 1930 the breaking of ground was underway. The following year the Legislature formalized the name and function for the institution. The architectural firm of Albert Kahn designed the buildings and contracts were let out for construction work to 35 separate companies. Construction work was pushed at what was described as a "miracle pace".
  
Governor Howard searched for a building to be used for a hospital in nearby towns of Vermillion, Elk Point and Canton with no success. In Yankton, he found two large wooden buildings--one belonging to the city and one to the Territory that were built to house German-Russian immigrants. The Governor secured the buildings and arranged to have them rebuilt on school lands north of Yankton at personal expense, a total of $2,286.85. The thirteenth session of the Dakota Territory Legislature met on January 14, 1879, and in the Governor’s message he advised the lawmakers of his action and the necessary laws were passed.  [[Yankton State Hospital|Click here for more...]]
+
The first patients were admitted one day short of the 1 year mark since the groundbreaking. At the time of the formal dedication, July 28, 1931, the physical plant consisted of the receiving hospital and administration building ("A" building), C-1 and C-2 blocks with combined facilities for approximately 900 patients; the unit containing 6 apartments ("J" building); dormitory and apartments for employees (K-1); powerhouse, warehouse & the superintendents quarters. All main buildings to which patients would have need of access were connected by underground tunnels.  [[Ypsilanti State Hospital|Click here for more...]]
 
}}
 
}}

Revision as of 10:05, 20 April 2025

Featured Article Of The Week

Ypsilanti State Hospital


Toledo11.jpg

During the 1920s the necessity for an additional state hospital became apparent. The combined capacity of the existing state hospitals was 1,900 beds short of what was considered adequate. In 1929 Governor Green proposed that a fifth state hospital be developed. The first appropriation of $1.5 million for the fiscal year ending 1930 was passed. Ypsilanti was chosen because of it's population density and proximity to the University Center in Ann Arbor as well as it's availability of land. Purchase of the 1,209 acres was begun in 1929.

On June 16, 1930 the breaking of ground was underway. The following year the Legislature formalized the name and function for the institution. The architectural firm of Albert Kahn designed the buildings and contracts were let out for construction work to 35 separate companies. Construction work was pushed at what was described as a "miracle pace".

The first patients were admitted one day short of the 1 year mark since the groundbreaking. At the time of the formal dedication, July 28, 1931, the physical plant consisted of the receiving hospital and administration building ("A" building), C-1 and C-2 blocks with combined facilities for approximately 900 patients; the unit containing 6 apartments ("J" building); dormitory and apartments for employees (K-1); powerhouse, warehouse & the superintendents quarters. All main buildings to which patients would have need of access were connected by underground tunnels. Click here for more...