Difference between revisions of "Portal:Featured Article Of The Week"

From Asylum Projects
Jump to: navigation, search
(32 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
{{FAformat
 
{{FAformat
|Title= Norwich State Hospital
+
|Title= Ypsilanti State Hospital
|Image= File:Nsh.jpg
+
|Image= Toledo11.jpg
 
|Width= 150px
 
|Width= 150px
|Body= he Norwich State Hospital opened its doors in 1904 to the insane with ninety-five patients in one building on over 100 acres.
+
|Body= During the 1920s the necessity for an additional state hospital became apparent. The combined capacity of the existing state hospitals was 1,900 beds short of what was considered adequate. In 1929 Governor Green proposed that a fifth state hospital be developed. The first appropriation of $1.5 million for the fiscal year ending 1930 was passed. Ypsilanti was chosen because of it's population density and proximity to the University Center in Ann Arbor as well as it's availability of land. Purchase of the 1,209 acres was begun in 1929.
  
One of the hospital’s first superintendents believed that mechanical restraint of patients was preferable to medication and believed in hydrotherapy as a treatment measure. The hospital's board quickly realized the population was exceeding what was safe. In 1905, two patient buildings were built, with a third opening in 1907.
+
On June 16, 1930 the breaking of ground was underway. The following year the Legislature formalized the name and function for the institution. The architectural firm of Albert Kahn designed the buildings and contracts were let out for construction work to 35 separate companies. Construction work was pushed at what was described as a "miracle pace".
  
Thirteen buildings were erected for patients during the next eight years. In 1913, with a population of 998, an administration building, three cottages for physicians, a carpenter and maintenance shop, the main kitchen, garage, laboratory, staff house, and an employees’ clubhouse had been erected, and the inebriate farm and the Colony had been established.
+
The first patients were admitted one day short of the 1 year mark since the groundbreaking. At the time of the formal dedication, July 28, 1931, the physical plant consisted of the receiving hospital and administration building ("A" building), C-1 and C-2 blocks with combined facilities for approximately 900 patients; the unit containing 6 apartments ("J" building); dormitory and apartments for employees (K-1); powerhouse, warehouse & the superintendents quarters. All main buildings to which patients would have need of access were connected by underground tunnels. [[Ypsilanti State Hospital|Click here for more...]]
 
 
Seven new buildings were built between 1920 and 1930; another was purchased for patients’ use. In 1929, the hospital peaked with 1,115 patients, while in 1930, the average daily census reached 2,422. In addition to new patient facilities, two more cottages were erected for physicians, a female employees’ home, a paint shop, a greenhouse, a superintendent’s residence, and two garages were built. [[Norwich State Hospital|Click here for more...]]
 
 
}}
 
}}

Revision as of 10:05, 20 April 2025

Featured Article Of The Week

Ypsilanti State Hospital


Toledo11.jpg

During the 1920s the necessity for an additional state hospital became apparent. The combined capacity of the existing state hospitals was 1,900 beds short of what was considered adequate. In 1929 Governor Green proposed that a fifth state hospital be developed. The first appropriation of $1.5 million for the fiscal year ending 1930 was passed. Ypsilanti was chosen because of it's population density and proximity to the University Center in Ann Arbor as well as it's availability of land. Purchase of the 1,209 acres was begun in 1929.

On June 16, 1930 the breaking of ground was underway. The following year the Legislature formalized the name and function for the institution. The architectural firm of Albert Kahn designed the buildings and contracts were let out for construction work to 35 separate companies. Construction work was pushed at what was described as a "miracle pace".

The first patients were admitted one day short of the 1 year mark since the groundbreaking. At the time of the formal dedication, July 28, 1931, the physical plant consisted of the receiving hospital and administration building ("A" building), C-1 and C-2 blocks with combined facilities for approximately 900 patients; the unit containing 6 apartments ("J" building); dormitory and apartments for employees (K-1); powerhouse, warehouse & the superintendents quarters. All main buildings to which patients would have need of access were connected by underground tunnels. Click here for more...