Difference between revisions of "Portal:Featured Article Of The Week"

From Asylum Projects
Jump to: navigation, search
(37 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
{{FAformat
 
{{FAformat
|Title= Clarinda State Hospital
+
|Title= Ypsilanti State Hospital
|Image= Clarinda11a.jpg
+
|Image= Toledo11.jpg
 
|Width= 150px
 
|Width= 150px
|Body= The Clarinda Treatment Complex was built in 1884 as the Clarinda State Hospital in Clarinda, Iowa of southwest Iowa. It was the third asylum in the state of Iowa and remains in operation today. The original plan for patients was to hold alcoholics, geriatrics, drug addicts, mentally ill, and the criminally insane. An act of the Twentieth General Assembly of the State of Iowa, chapter 201, authorized the appropriation of $150,000 for the purpose of establishing an additional hospital for the insane. The act went into effect April 23, 1884, and provided that the Governor should select three commissioners, with power to locate the site for the hospital somewhere in Southwestern Iowa.
+
|Body= During the 1920s the necessity for an additional state hospital became apparent. The combined capacity of the existing state hospitals was 1,900 beds short of what was considered adequate. In 1929 Governor Green proposed that a fifth state hospital be developed. The first appropriation of $1.5 million for the fiscal year ending 1930 was passed. Ypsilanti was chosen because of it's population density and proximity to the University Center in Ann Arbor as well as it's availability of land. Purchase of the 1,209 acres was begun in 1929.
  
The act provided that not less than 320 acres of land should be purchased in the name of the state, so selected as to insure an abundant supply of good, pure water and to be susceptible of proper and efficient drainage. It was also provided that no gratuity or donation should be offered or received from any place as an inducement for its location; that the commissioners should, as soon as the location was fixed, secure and adopt plans and specifications and estimates for the buildings to be erected. All buildings to be fireproof, the exterior plain and of brick, to be built on the cottage plan; the board to invite bids after publication for 30 days in Des Moines newspapers; the contract to be let to the lowest bidder complying with the requirements of the commissioners. They were to employ a competent architect and superintendent of construction, appoint a secretary and keep accurate minutes of their doings.  [[Clarinda State Hospital|Click here for more...]]
+
On June 16, 1930 the breaking of ground was underway. The following year the Legislature formalized the name and function for the institution. The architectural firm of Albert Kahn designed the buildings and contracts were let out for construction work to 35 separate companies. Construction work was pushed at what was described as a "miracle pace".
 +
 
 +
The first patients were admitted one day short of the 1 year mark since the groundbreaking. At the time of the formal dedication, July 28, 1931, the physical plant consisted of the receiving hospital and administration building ("A" building), C-1 and C-2 blocks with combined facilities for approximately 900 patients; the unit containing 6 apartments ("J" building); dormitory and apartments for employees (K-1); powerhouse, warehouse & the superintendents quarters. All main buildings to which patients would have need of access were connected by underground tunnels.  [[Ypsilanti State Hospital|Click here for more...]]
 
}}
 
}}

Revision as of 10:05, 20 April 2025

Featured Article Of The Week

Ypsilanti State Hospital


Toledo11.jpg

During the 1920s the necessity for an additional state hospital became apparent. The combined capacity of the existing state hospitals was 1,900 beds short of what was considered adequate. In 1929 Governor Green proposed that a fifth state hospital be developed. The first appropriation of $1.5 million for the fiscal year ending 1930 was passed. Ypsilanti was chosen because of it's population density and proximity to the University Center in Ann Arbor as well as it's availability of land. Purchase of the 1,209 acres was begun in 1929.

On June 16, 1930 the breaking of ground was underway. The following year the Legislature formalized the name and function for the institution. The architectural firm of Albert Kahn designed the buildings and contracts were let out for construction work to 35 separate companies. Construction work was pushed at what was described as a "miracle pace".

The first patients were admitted one day short of the 1 year mark since the groundbreaking. At the time of the formal dedication, July 28, 1931, the physical plant consisted of the receiving hospital and administration building ("A" building), C-1 and C-2 blocks with combined facilities for approximately 900 patients; the unit containing 6 apartments ("J" building); dormitory and apartments for employees (K-1); powerhouse, warehouse & the superintendents quarters. All main buildings to which patients would have need of access were connected by underground tunnels. Click here for more...