Difference between revisions of "Portal:Featured Article Of The Week"

From Asylum Projects
Jump to: navigation, search
(40 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
{{FAformat
 
{{FAformat
|Title= East Louisiana State Hospital
+
|Title= Ypsilanti State Hospital
|Image= Jackson_Louisiana_SH_PC.jpg
+
|Image= Toledo11.jpg
 
|Width= 150px
 
|Width= 150px
|Body= An act of the legislative session of 1847 established "The Insane Asylum of the State of Louisiana" in Jackson and provided, among other things, for the construction of the Asylum's physical plant. The Asylum's Board of Administrators appointed an architect, a Mr. Gibbens. to draw up the plans. He was specifically told not to design something that would look like a prison. Gibbens came up with the design of the Center Building with its wings. The Board of Administrators purchased a 250-acre tract known as "Flowery Hill" a short distance from the business section of Jackson, separated from the town by a small stream.
+
|Body= During the 1920s the necessity for an additional state hospital became apparent. The combined capacity of the existing state hospitals was 1,900 beds short of what was considered adequate. In 1929 Governor Green proposed that a fifth state hospital be developed. The first appropriation of $1.5 million for the fiscal year ending 1930 was passed. Ypsilanti was chosen because of it's population density and proximity to the University Center in Ann Arbor as well as it's availability of land. Purchase of the 1,209 acres was begun in 1929.
  
On July 5, 1847, Robert Perry signed a contract with the Board for the building of the Asylum, and President David Shattuck of Centenary College signed as security for Perry. The Board requested that the West Wing be completed by December 1, 1847, but there were delays due to bad weather and the building was not ready for occupancy until the fall of 1848. The East Wing was not finished until 1849. Center Building was ready for use in 1854, but it was never completed according to Gibbens' plans. The rear of the building was to have extended another hundred feet and to have contained a central kitchen, storerooms, and other facilities. Although the Asylum's early superintendents frequently asked the Legislature for funds to complete Center Building, they were never provided.  [[East Louisiana State Hospital|Click here for more...]]
+
On June 16, 1930 the breaking of ground was underway. The following year the Legislature formalized the name and function for the institution. The architectural firm of Albert Kahn designed the buildings and contracts were let out for construction work to 35 separate companies. Construction work was pushed at what was described as a "miracle pace".
 +
 
 +
The first patients were admitted one day short of the 1 year mark since the groundbreaking. At the time of the formal dedication, July 28, 1931, the physical plant consisted of the receiving hospital and administration building ("A" building), C-1 and C-2 blocks with combined facilities for approximately 900 patients; the unit containing 6 apartments ("J" building); dormitory and apartments for employees (K-1); powerhouse, warehouse & the superintendents quarters. All main buildings to which patients would have need of access were connected by underground tunnels.  [[Ypsilanti State Hospital|Click here for more...]]
 
}}
 
}}

Revision as of 10:05, 20 April 2025

Featured Article Of The Week

Ypsilanti State Hospital


Toledo11.jpg

During the 1920s the necessity for an additional state hospital became apparent. The combined capacity of the existing state hospitals was 1,900 beds short of what was considered adequate. In 1929 Governor Green proposed that a fifth state hospital be developed. The first appropriation of $1.5 million for the fiscal year ending 1930 was passed. Ypsilanti was chosen because of it's population density and proximity to the University Center in Ann Arbor as well as it's availability of land. Purchase of the 1,209 acres was begun in 1929.

On June 16, 1930 the breaking of ground was underway. The following year the Legislature formalized the name and function for the institution. The architectural firm of Albert Kahn designed the buildings and contracts were let out for construction work to 35 separate companies. Construction work was pushed at what was described as a "miracle pace".

The first patients were admitted one day short of the 1 year mark since the groundbreaking. At the time of the formal dedication, July 28, 1931, the physical plant consisted of the receiving hospital and administration building ("A" building), C-1 and C-2 blocks with combined facilities for approximately 900 patients; the unit containing 6 apartments ("J" building); dormitory and apartments for employees (K-1); powerhouse, warehouse & the superintendents quarters. All main buildings to which patients would have need of access were connected by underground tunnels. Click here for more...