Editing Worcester State Hospital

From Asylum Projects
Jump to: navigation, search

Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.

The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision Your text
Line 13: Line 13:
 
| closed =
 
| closed =
 
| demolished = 2015
 
| demolished = 2015
| current_status = [[Demolished Institution|Demolished]]  
+
| current_status = [[Demolished Institution|Demolished]] (Kirkbride)
 
| building_style =*[[Kirkbride Planned Institutions|Kirkbride Plan]]
 
| building_style =*[[Kirkbride Planned Institutions|Kirkbride Plan]]
 
| architect(s) =<BR>
 
| architect(s) =<BR>
Line 84: Line 84:
 
==New Hospital==
 
==New Hospital==
 
[[image:WSH NewHosp Thumb.jpg|280px|right]]
 
[[image:WSH NewHosp Thumb.jpg|280px|right]]
In May 2009, Worcester saw the funds approved for the construction of a new Worcester State Hospital. A new 320-bed psychiatric hospital serving individuals from all parts of the Commonwealth is now in construction. The innovative design will provide an environment of care that maximizes the effectiveness of clinical and rehabilitation staff, allowing the facility to operate at an optimum ratio of staff to patients. The building’s plan will reflect the stages of recovery: by using familiar environments, ranging from “house” to “neighborhood” to “downtown.” A secure facility, outdoor courts relate to each living unit, and the “downtown” surrounds a central “village green” shared by all. The low-rise scale will serve to emphasize the residential character, and minimize the stigma attached to psychiatric facilities. This new facility will enable DMH to close two antiquated facilities, parts of which date to the 19th century, thereby dramatically reducing future operating and capital expenses. With the significant advances in the field of psychiatric care, which are reducing the number of people who need long term care, this building may become the central psychiatric care facility for the entire state.<ref>http://www.mass.gov/?pageID=afterminal&L=5&L0=Home&L1=Property+Management+%26+Construction&L2=Design+%26+Construction+of+Public+Buildings&L3=Current+%26+Completed+Projects&L4=Human+Services+Projects&sid=Eoaf&b=terminalcontent&f=dcam_project_highlights_hs_dmh_hosp&csid=Eoaf</ref><ref>https://www.worcesterchamber.org/latest-progress-on-dmh-psychiatric-facility-worcester</ref><BR>
+
In May 2009, Worcester saw the funds approved for the construction of a new Worcester State Hospital. Since May, a multitude of progress has been made on this $302 million project, and is estimated to be completed in March 2012. A new 320-bed psychiatric hospital serving individuals from all parts of the Commonwealth is now in construction. The innovative design will provide an environment of care that maximizes the effectiveness of clinical and rehabilitation staff, allowing the facility to operate at an optimum ratio of staff to patients. The building’s plan will reflect the stages of recovery: by using familiar environments, ranging from “house” to “neighborhood” to “downtown.” A secure facility, outdoor courts relate to each living unit, and the “downtown” surrounds a central “village green” shared by all. The low-rise scale will serve to emphasize the residential character, and minimize the stigma attached to psychiatric facilities. This new facility will enable DMH to close two antiquated facilities, parts of which date to the 19th century, thereby dramatically reducing future operating and capital expenses. With the significant advances in the field of psychiatric care, which are reducing the number of people who need long term care, this building may become the central psychiatric care facility for the entire state.<ref>http://www.mass.gov/?pageID=afterminal&L=5&L0=Home&L1=Property+Management+%26+Construction&L2=Design+%26+Construction+of+Public+Buildings&L3=Current+%26+Completed+Projects&L4=Human+Services+Projects&sid=Eoaf&b=terminalcontent&f=dcam_project_highlights_hs_dmh_hosp&csid=Eoaf</ref><ref>https://www.worcesterchamber.org/latest-progress-on-dmh-psychiatric-facility-worcester</ref><BR>
 
<BR>
 
<BR>
 
*Designer: Ellenzweig Associates, Inc.<BR>
 
*Designer: Ellenzweig Associates, Inc.<BR>
Line 110: Line 110:
  
 
==Videos==
 
==Videos==
Video rendering of the new hospital building.
+
Video rendering of the proposed new hospital building.
  
 
{{#ev:youtube|IrDTUxPP-XU}}
 
{{#ev:youtube|IrDTUxPP-XU}}

Please note that all contributions to Asylum Projects may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see Asylum Projects:Copyrights for details). Do not submit copyrighted work without permission!

To edit this page, please answer the question that appears below (more info):

Cancel | Editing help (opens in new window)