Difference between revisions of "Portal:Featured Article Of The Week"

From Asylum Projects
Jump to: navigation, search
Line 1: Line 1:
 
{{FAformat
 
{{FAformat
|Title= Hawaii State Hospital
+
|Title= Ypsilanti State Hospital
|Image= HawaiiSH2.jpg
+
|Image= Ypsi02.jpg
 
|Width= 150px
 
|Width= 150px
|Body= On January 6, 1930 the Oahu Asylum closed and the U.S. Army moved the 549 patients to the new Territorial Hospital in Kaneohe. Even at its opening in 1930, the newly named Territorial Hospital was over-crowded, Overburdened facilities have been the situation ever since. It was not yet been possible for the Legislature to provide sufficient appropriations so that adequate buildings and staff could be maintained by the hospital, in spite of great advances in the hospital program itself. In 1939, the control of the Territorial Hospital was changed from the Board of Health, where it had been since its opening, to the newly formed Department of Institutions.
+
|Body= During the 1920s the necessity for an additional state hospital became apparent. The combined capacity of the existing state hospitals was 1,900 beds short of what was considered adequate. In 1929 Governor Green proposed that a fifth state hospital be developed. The first appropriation of $1.5 million for the fiscal year ending 1930 was passed. Ypsilanti was chosen because of it's population density and proximity to the University Center in Ann Arbor as well as it's availability of land. Purchase of the 1,209 acres was begun in 1929.
  
World War II prevented further growth in the psychiatric field for a few years, but almost immediately after the war, starting in about 1946, a rapid surge of growth of our psychiatric facilities was noted. The private practice of psychiatry as a specialty received more interest, and additional offices opened one by one. The Territorial Hospital in Kaneohe was able to further modernize and develop its treatment program. The year 1948 marked the organization of the Neuro-Psychiatric Society of Hawaii.
+
On June 16, 1930 the breaking of ground was underway. The following year the Legislature formalized the name and function for the institution. The architectural firm of Albert Kahn designed the buildings and contracts were let out for construction work to 35 separate companies. Construction work was pushed at what was described as a "miracle pace".
  
In 1972 there were only 200 patients actually in residence at the State Hospital (even though the rate of first admissions has continued to climb as the population of the State soars over 750,000). Some of the older original buildings are now used by the Windward Community School.   [[Hawaii State Hospital|Click here for more...]]
+
The first patients were admitted one day short of the 1 year mark since the groundbreaking. At the time of the formal dedication, July 28, 1931, the physical plant consisted of the receiving hospital and administration building ("A" building), C-1 and C-2 blocks with combined facilities for approximately 900 patients; the unit containing 6 apartments ("J" building); dormitory and apartments for employees (K-1); powerhouse, warehouse & the superintendents quarters. All main buildings to which patients would have need of access were connected by underground tunnels.   [[Ypsilanti State Hospital|Click here for more...]]
 
}}
 
}}

Revision as of 05:42, 22 April 2018

Featured Article Of The Week

Ypsilanti State Hospital


Ypsi02.jpg

During the 1920s the necessity for an additional state hospital became apparent. The combined capacity of the existing state hospitals was 1,900 beds short of what was considered adequate. In 1929 Governor Green proposed that a fifth state hospital be developed. The first appropriation of $1.5 million for the fiscal year ending 1930 was passed. Ypsilanti was chosen because of it's population density and proximity to the University Center in Ann Arbor as well as it's availability of land. Purchase of the 1,209 acres was begun in 1929.

On June 16, 1930 the breaking of ground was underway. The following year the Legislature formalized the name and function for the institution. The architectural firm of Albert Kahn designed the buildings and contracts were let out for construction work to 35 separate companies. Construction work was pushed at what was described as a "miracle pace".

The first patients were admitted one day short of the 1 year mark since the groundbreaking. At the time of the formal dedication, July 28, 1931, the physical plant consisted of the receiving hospital and administration building ("A" building), C-1 and C-2 blocks with combined facilities for approximately 900 patients; the unit containing 6 apartments ("J" building); dormitory and apartments for employees (K-1); powerhouse, warehouse & the superintendents quarters. All main buildings to which patients would have need of access were connected by underground tunnels. Click here for more...